Nam Kong 2 Hydropower Plant, Laos 

Located in Attapu Province, Laos Water Head: 98.8m Total installed capacity: 66MW (3x22KW) Type of turbine: Vertical Francis Work Scope: 1. Equipment supply: Supervisory control and protection system 2. Technical service: installation, adjusting and testing, commissioning; site training

Located in Attapu Province, Laos

Water Head: 98.8m

Total installed capacity: 66MW (3x22KW)

Type of turbine: Vertical Francis

 

Work Scope:

1. Equipment supply: Supervisory control and protection system

2. Technical service: installation, adjusting and testing, commissioning; site training

   

 

   

Request A Quote